PMP认证考试练习题(二十一)(中英文)
1. Which of the following techniques can be used to integrate and measure a project’s schedule and cost performance? 要整合和衡量项目进度和成本绩效,能用下列哪项技术方法: 2. A fully integrated project plan assists the project manager by: 完全整合的项目计划对项目经理的帮助是通过: 3. The true status of a project cannot be determined unless which of the following are jointly considered: 要知道项目真实状态,必须结合考虑下列哪一项: 4. Which of the following is not used for reporting performance? 下列哪一种技术没有被用来报告绩效: 5. Communication technology factors that may affect the project include all but which one of the following? 可能影响项目的沟通技术因素包括所有下列事项,除了: 6. The project manager issued a series of status reports over the course of several months to address issues that had emerged in project negotiations with the contractor. This represents what form of communication? 项目经理发出了关于数月来项目状态一系列报告,用以表明在与合同方的项目谈判中出现的问题,这表示的是什么形式的沟通: 7. Project management software: 项目管理软件: 8. Debra realizes she must determine the aspects of her project that may be at risk. Which of following is not a useful tool for her to use in identifying these risks? Debra 认识到她必须决定项目可能在哪些方面有风险. 在识别这些风险中,下列哪一工具对她没有什么用处? 9. Using the table below, the expected profit (or loss) of using the aggressive schedule is: 用下表数据计算,用积极的进度的预期的利润 ( 或损失) 是: 10. An organization is considering bidding on a project in a new technology area with which it has no prior experience. The organization was able to locate knowledgeable experts in that field to help understand the new aspects. Therefore, probabilities can be assigned to possible profit or loss outcomes of this project. This would be an example of decision making under: 一个组织在考虑竞标一个新技术领域的项目,但对该技术领域没有经验,组织能识别找出该领域知识专家来帮助理解这个新的领域. 因此,能够确定该项目可能的利润或损失结果概率. 这会是一个在什么条件下的决策例子: |